CIVIL DESIGN CONSULTANCY,
PROJECT MANAGEMENT
AND
CONTRACTING
Let’s Succeed Together
100+
Clients Served
500+
Completed Projects
80%
Repeat Business
ISO CERTIFICATION
ISO 9001:2015, ISO 14001:2015, ISO 27001:2013, ISO 45001:2018,ISO 50001:2018, ISO 17123-5:2018.
SERVICES
SIGNATURE PROJECTS
From all over India
NELLORE, ANDHRA PRADESH
Total Project Cost- 4441.88 Cr
Providing Consultancy Services and preparation of Detail project reports for entire Nellore District’s Water Supply Schemes for entire Nellore District (3024 Villages)
Total Length of Pipe line Proposed- 11254 km
PALAJORI, JHARKHAND
Total Project Cost- 242.71 Cr
-
Consultancy work for Preparation of PFR, DPR including preparation of Bid document in EPC / Turnkey / Item rate mode etc. for Palojori Block Rural Water Supply Scheme Under division Madhupur, Dist:-Deoghar (Jharkhand)
-
Total Length of Pipe line Proposed- 562.82 Km
DAHOD, GUJARAT
Total Project Cost- 385.21 Cr
-
Preparation of Detail Project Report with Detail topographic survey for 513 villages from Dahod District water supply Under Jal Jeevan Mission
-
Total Length of Pipe line Proposed- 5643 km
SANTA CRUZ CONSTITUENCY, GOA
Total Project Cost- 252 Cr
-
Preparation of Detail project Report and Master planning of Sewerage collection system, Treatment and Disposal for Santa Cruz Constituency in Goa
-
Total Length of Pipe line Proposed- 65 km (By HDD method)
UTTAR KANNADA DISTRICT, KARNATAKA
Total Project Cost- 1106.29 Cr
-
Preparation of Preliminary Scheme Report for entire Uttara Kannada District water supply schemes
-
Total Length of Pipe line Proposed- 3089.97 km
PONDI KHURD - SALKA, CHHATTISGARH
Total Project Cost- 104.48 Cr
-
Preparation of Detail project Report for Pondi Khurd and Salka Group Water Supply scheme covering 80 villages under Jal Jeevan Mission
-
Total Length of Pipe line Proposed- 1964 km
DHANBAD, JHARKHAND
Total Project Cost- 92.69 Cr
-
Consultancy work for Preparation of PFR, DPR including preparation of Bid document in EPC / Turnkey / Item rate mode etc. for Baghmara Block (HQ) and Adjoining Villages Rural Water Supply Scheme Under division Dhanbad-2
-
Total Length of Pipe line Proposed- 210.36 km
HAZARIBAGH, KHUNTI AND GIRIDIH FROM JHARKHAND
Total Project Cost- 120.37 Cr
-
World Bank aided Single Village Water Supply Schemes in Jharkhand​
-
Total Length of Pipe line Proposed- 1039.88
CUTTACK DISTRICT, ODISHA
Total Project Cost- 250.89 Cr
-
Providing consultancy services for preparation of DPR for Rural piped water supply project to all villages under Athagarh block in Cuttack
-
Total Length of Pipe line Proposed- 350.6 km
BOKARO, JHARKHAND
Total Project Cost- 158.58 Cr
-
Consultancy work for Preparation of PFR, DPR including preparation of Bid document in EPC / Turnkey / Item rate mode etc. for Chandankiyari Block RWSS (Remaining uncovered Panchayat / Villages / Tola) with Weir (wherever required) Scheme Under division Chas, Dist:-Bokaro
-
Total Length of Pipe line Proposed- 337.91 Km
PURBI SINGHBHUM, JHARKHAND
Total Project Cost- 137.92 Cr
-
Consultancy work for Preparation of PFR, DPR including preparation of Bid document in EPC / Turnkey / Item rate mode etc. for Burjudih / Burujbani and Adjoining Villages Rural Water Supply Scheme in Chakuliya Block, Under division Jamshedpur.
-
Total Length of Pipe line Proposed- 606.78 km
DUMKA, JHARKHAND
Total Project Cost- 228.99 Cr
-
Consultancy work for Preparation of PFR, DPR including preparation of Bid document in EPC / Turnkey / Item rate mode etc. for Jama and Jharmundi Multi Villages Rural Water Supply Scheme in Jama Block and Jharmundi Block, Under division Dumka-2
-
Total Length of Pipe line Proposed- 385.65 km
KENDRAPARA, ODISHA
Total Project Cost- 121.87 Cr
-
•Preparation of Detailed Project Report of Mega PWS to 82 villages of Pattamundai Block of Kendrapara District.
-
Total Length of Pipe line Proposed- 304.6 km
JASHPUR, CHHATTISGARH
Total Project Cost- 338.31 Cr
-
Preparation of Detail project Reports for 682 villages from Jashpur District for water supply under Jal Jeevan Mission
-
Total Length of Pipe line Proposed- 3069 km
SIRIDAO PALEM VILLAGE, GOA
Total Project Cost- 85 Cr
-
Preparation of Detail project Report and Master planning of Sewerage collection system, Treatment and Disposal for Siridao Palem Village in Goa
-
Total Length of Pipe line Proposed- 20 km
KODAGU, KARNATAKA
Total Project Cost- 200 Cr
-
Preparation of D.P.R. including detailed route and cadastral survey, investigation using DGPS & Total Station equipment using latest software such as Water Gems for “Jal Jeevan Mission” for 355 Villages for Madikeri (Kodagu)
-
Total Length of Pipe line Proposed- 2130 km
JALNA, MAHARASTRA
Total Project Cost- 97.98 Cr
-
120 Villages Extension scheme for works not considered in 173 Grid Wss and 95 Grid Wss in Jalna District
-
Total Length of Pipe line Proposed- 171.665 km
OSMANABAD, MAHARASTRA
Total Project Cost- 200 Cr
-
Makani and 15 other villages Regional water supply scheme
-
Total Length of Pipe line Proposed- 221.158 km
GUJRAT URBAN DEVELOPMENT MISSION, GADHINAGAR (GUDM)
Total Project Cost- 481.80 Crs
-
Preparation of Detailed project report for Water supply scheme, Sewerage scheme, Green Space Development, Rejuvenation of water body and related work listed in the tender for the project under AMRUT 2.0 for SWAP-1, 2, and 3.
-
No. of ULBs- 29 ULBs
EXPERT TEAM
MR. MADHAV KALUSKAR
Director, Hydraulic Expert & Technical Head
MR. SANJAY GADE
Director and Administration Head
MR. HRISHIKESH KALUSKAR
Vice President
Mr. VISHWANATH FULARI
Technical Advisor and Contract Management Expert
MR. ARVIND TORO
Technical Advisor and Contract Management Expert
Mr. PRASHANT WADEKAR
General Manager and Project Management Expert
Mr. SAMEER KALE
Project Coordinator and Hydraulic Expert (Central & North Region)
Mr. MAYURESH DINGORKAR
Project Coordinator and Hydraulic Expert (South Region)
Mr. DINKAR SHELKE
Team Leader and Drafting Expert
Mr. PRADEEP TAMBE
Project Manager (Jharkhand Branch)
VALUED CLIENTS
Our Presence
CONTACT US
Contact us today and see what we can do for you.
admin@samarthinfratech.in
sisplpune@rediffmail.com
samarthinfratechpune@gmail.com
-
Pune Head Office ​
Office No 40,41 Lokmanya House,
Lokmanya Colony, opposite Kothrud Police Station, Paud Road,
Pune-411038
Ph: +91 80802 26790
-
Ranchi Branch Office ​
H. No. 1 Kunwar Singh Colony, Hinoo Airport Road Ranchi- 834002
Ph: +91 79911 34726
-
Kolkata Project Office
Tower 4, Room No.: 301Malancha Bengal DCL, Mallika HIG, Street Number 622, Action Area IIB, Newtown, Kolkata,
West Bengal -700157
Ph: +91 86691 27237
-
Assam Project Office
Second Floor, House No 7/C, Manik Nagar, 2nd Bye Lane, Right, RG Baruah Rd, Guwahati, Assam – 781005
-
Odisha Project Office
Plot No. 1131/5117, Lane 2, Satabdi Nagar, Baramunda, Bhubaneswar - 751003.
Ph: +91 8080226790
​